The Tribe seeks comments on the Antidegradation Decision for the sites 1-3 and 6-7 of the proposed Potato River Road Project. Site 1 is located near Upper Vaughn Creek, an ERW; sites 2 – 3 are located near Vaughn Creek and ORW; and sites 6 – 7 are located near ERW wetlands. In general, the project consists of replacing the existing culverts, installing energy dissipators on the new culvert outlet, bank stabilization, and roadway repair. (Read More)